Name: Multi-Holes Post Tension Anchor Used in Bridge Construction. This anchor is specifically designed for prestressing concrete in engineering construction projects, particularly in bridge construction. It is utilized by pre-installing and positioning the anchor before pouring concrete, and then burying it at both ends of the concrete. The anchor includes two bellows-shaped end faces, which provide stability for the jack during tensioning. To ensure optimal performance, it is essential to maintain the anchors properly, keeping them free from rust, water, and other debris. Additionally, it is recommended to apply lubricant on the outer surface of the tool clip and the inner surface of the taper hole of the anchor plate before use, while also regularly removing any debris from the clip's surface. Safety measures must be taken during tensioning, and it is crucial to ensure that no individuals are present near the tensioning jack. It is important to note that the anchor system should be used exclusively, without mixing it with other systems. For technical data, the YJM13 Anchorage includes specifications for the anchor head, bearing plate, duct, spiral reinforcement, and stressing jack, such as ΦA, B, Square, Round, ΦE(ID), and ΦF. With its reliable performance and suitability for bridge construction, this Multi-Holes Post Tension Anchor is a valuable asset in the field of engineering.
Application description
It is suitable for anchors used for prestressing concrete in the process of engineering construction. Generally used in bridge construction, pre-installed and positioned, and then poured concrete, buried at both ends of the concrete, that is, the two ends of the bellows, which are the end faces set for the stability of the jack during tensioning.
Product parameters
Technical data of YJM13 Anchorage | ||||||||||
Specification | Anchor Head | Bearing Plate | Duct | Spiral Reinforcement | Stressing Jack | |||||
ΦA | B | Square | Round | ΦE(ID) | ΦF | H | ΦG | N | ||
C*D | ΦC*D | |||||||||
YJM13-1 | 38 | 40 | 80×10 | - | 35 | 80 | 30 | 6 | 3 | QYC270 |
YJM13-2 | 76 | 42 | 115×80 | 120×80 | 45 | 120 | 40 | 8 | 3 | YDC1100 |
YJM13-3 | 83 | 42 | 120×80 | 130×80 | 50 | 120 | 40 | 10 | 3 | YDC1100 |
YJM13-4 | 87 | 42 | 130×87 | 135×85 | 50 | 135 | 50 | 10 | 3 | YDC1100 |
YJM13-5 | 97 | 42 | 140×92 | 140×100 | 55 | 140 | 50 | 10 | 4 | YDC1100 |
YJM13-6 | 107 | 45 | 150×97 | 150×125 | 60 | 160 | 50 | 12 | 4 | YDC1100 |
YJM13-7 | 107 | 45 | 150×97 | 150×125 | 60 | 160 | 50 | 12 | 4 | YDC1100 |
YJM13-8 | 117 | 45 | 165×115 | 165×135 | 60 | 170 | 50 | 12 | 4 | YDC1500 |
YJM13-9 | 127 | 48 | 175×125 | 175×140 | 70 | 180 | 50 | 12 | 4 | YDC1500 |
YJM13-10 | 136 | 48 | 180×130 | 180×150 | 80 | 200 | 50 | 14 | 4 | YDC2500 |
YJM13-11 | 138 | 50 | 180×130 | 180×150 | 80 | 200 | 50 | 14 | 4 | YDC2500 |
YJM13-12 | 143 | 50 | 190×140 | 190×150 | 80 | 210 | 50 | 14 | 5 | YDC2500 |
YJM13-13 | 147 | 53 | 190×140 | 190×150 | 80 | 210 | 50 | 14 | 5 | YDC2500 |
YJM13-14 | 153 | 53 | 195×150 | 200×160 | 80 | 220 | 50 | 14 | 5 | YDC2500 |
YJM13-15 | 157 | 55 | 195×150 | 200×160 | 90 | 220 | 50 | 14 | 5 | YDC2500 |
YJM13-16 | 167 | 55 | 210×160 | 210×185 | 90 | 240 | 60 | 16 | 6 | YDC2500 |
YJM13-17 | 172 | 58 | 220×175 | 235×185 | 90 | 240 | 60 | 16 | 6 | YDC3500 |
YJM13-18 | 176 | 58 | 235×175 | 235×185 | 90 | 260 | 60 | 16 | 6 | YDC3500 |
YJM13-19 | 176 | 58 | 235×175 | 235×185 | 90 | 260 | 60 | 16 | 6 | YDC3500 |
YJM13-20 | 196 | 60 | 270×185 | 260×200 | 90 | 270 | 60 | 16 | 6 | YDC3500 |
YJM13-21 | 196 | 63 | 270×185 | 260×200 | 90 | 270 | 60 | 16 | 6 | YDC3500 |
YJM13-22 | 196 | 65 | 270×185 | 260×200 | 90 | 270 | 60 | 18 | 6 | YDC3500 |
YJM13-23 | 206 | 65 | 295×245 | 275×260 | 100 | 280 | 60 | 18 | 6 | YDC4000 |
YJM13-24 | 206 | 68 | 295×245 | 275×260 | 100 | 280 | 60 | 18 | 6 | YDC4000 |
YJM13-25 | 216 | 68 | 300×260 | 275×290 | 100 | 290 | 60 | 18 | 6 | YDC4000 |
Technical data of YJM15 Anchorage | ||||||||||
Specification | Anchor Head | Bearing Plate | Duct | Spiral Reinforcement | Stressing Jack | |||||
ΦA | B | Square | Round | ΦE (ID) |
ΦF | H | ΦG | N | ||
C×D | ΦC×D | |||||||||
YJM15-1 | 43 | 46 | 80×12 | 80×20 | 35 | 80 | 30 | 8 | 4 | QYC270 |
YJM15-2 | 83 | 48 | 130×85 | 135×80 | 50 | 120 | 40 | 10 | 4 | YDC6500 |
YJM15-3 | 87 | 48 | 130×87 | 135×85 | 50 | 120 | 40 | 10 | 4 | YDC650 |
YJM15-4 | 97 | 48 | 140×92 | 140×100 | 50 | 140 | 50 | 10 | 4 | YDC1100 |
YJM15-5 | 107 | 48 | 150×97 | 150×120 | 55 | 150 | 50 | 10 | 4 | YDC1100 |
YJM15-6 | 122 | 50 | 165×115 | 165×135 | 70 | 170 | 50 | 12 | 4 | YDC1500 |
YJM15-7 | 122 | 50 | 175×125 | 175×135 | 70 | 170 | 50 | 12 | 4 | YDC1500 |
YJM15-8 | 137 | 53 | 180×130 | 180×150 | 80 | 190 | 50 | 12 | 4 | YDC2500 |
YJM15-9 | 147 | 53 | 190×140 | 190×150 | 80 | 200 | 50 | 12 | 4 | YDC2500 |
YJM15-10 | 157 | 53 | 195×150 | 210×160 | 90 | 210 | 60 | 14 | 4 | YDC2500 |
YJM15-11 | 157 | 55 | 210×160 | 210×160 | 90 | 210 | 60 | 14 | 4 | YDC2500 |
YJM15-12 | 167 | 55 | 210×160 | 210×185 | 90 | 230 | 60 | 14 | 4 | YDC2500 |
YJM15-13 | 177 | 55 | 220×175 | 210×185 | 90 | 230 | 60 | 14 | 4 | YDC3500 |
YJM15-14 | 177 | 58 | 225×175 | 235×185 | 90 | 240 | 60 | 14 | 4 | YDC3500 |
YJM15-15 | 187 | 60 | 235×175 | 235×185 | 90 | 260 | 60 | 16 | 5 | YDC3500 |
YJM15-16 | 187 | 60 | 240×175 | 235×185 | 90 | 260 | 60 | 16 | 5 | YDC3500 |
YJM15-17 | 197 | 63 | 250×185 | 265×200 | 100 | 280 | 60 | 16 | 5 | YDC4000 |
YJM15-18 | 197 | 63 | 270×185 | 265×200 | 100 | 280 | 60 | 16 | 5 | YDC4000 |
YJM15-19 | 197 | 63 | 270×185 | 265×200 | 100 | 280 | 60 | 16 | 5 | YDC4000 |
YJM15-20 | 217 | 68 | 295×245 | 285×260 | 120 | 290 | 60 | 16 | 5 | YDC5000 |
YJM15-21 | 217 | 70 | 295×245 | 285×260 | 120 | 290 | 60 | 16 | 5 | YDC5000 |
YJM15-22 | 217 | 70 | 295×245 | 285×260 | 120 | 290 | 60 | 18 | 5 | YDC5000 |
YJM15-23 | 237 | 73 | 310×260 | 320×260 | 120 | 320 | 60 | 18 | 5 | YDC5000 |
YJM15-24 | 237 | 75 | 310×260 | 320×260 | 120 | 320 | 60 | 18 | 5 | YDC5000 |
YJM15-25 | 237 | 78 | 310×300 | 320×300 | 120 | 330 | 70 | 18 | 5 | YDC6500 |
Warm tips
1. The anchors should be kept properly, and there should be no rust, water, and other sundries in use.
2. Apply lubricant on the outer surface of the tool clip and the inner surface of the taper hole of the anchor plate before use, and often remove the debris on the surface of the clip.
3. Safety measures should be taken during tensioning, and no one can stand after the tensioning jack.
4. The anchor system should be used together and cannot be mixed with other systems.
FAQ:
Q1: Whether the rig is used for rock holes or soil holes?
A1: Equipped with different drill bits according to the application object. Rock drilling rigs are equipped with round steel drill impact hammers and rock drill bits. The soil drilling rigs require a twist drill pipe and a three-blade drill bit.
Q2: How much tonnage can a bridge jack lift??
A2: The range is from 50 to 1000 tons, depending on the application needs we have the right choice for you.
Q3: How many meters is the connection between the jack and the oil pump?
A3: The factory standard is two meters. If you need longer, we will make it for you.
Q4: What is the difference between the hydraulic oil pump?
A4: For the tension jack, it is a 50 MPa 3 kW oil pump and 60 MPa 4 kW oil pump.
Q5: What kind of packages does a set of anchors have?
A5: Anchor ring, clip, anchor pad, spiral rib.
Q6: Which payment term can you accept?
A6: 100% T/T( Decide according to actual situation)
Q7: How long is the machine warranty?
A7: One year for the machine and provide technical support according to your needs.
Q8: How long will it take to arrange production?
A8: we can deliver the normal goods within 7-15 days. Other nonstandard electrical items we will deliver within 25-30 days.
Q9: Which trade term can you accept?
A9: Available trade terms: FOB, CIF, CFR, EXW, etc.
Q10: Do you provide samples? Is it free or extra?
A10: Yes, we could offer you the sample machine. But it's not free. You need to pay for the sample and the cost of the freight.
Q11: What are your terms of payment?
A11: We accept T/T, Western Union, Money Gram, Paypal, L/C, etc.