Product Description
Remote control crawler photovoltaic cleaning robot is an intelligent fixed cleaning robot , mainly aimed at cleaning components of large and medium-sized photovoltaic power stations. When installed, it can be dry-hanged on the photovoltaic module for automatic cleaning.
Remote control crawler photovoltaic cleaning robot has two control modes: automatic and manual. The manual mode supports remote control. It adopts waterless cleaning technology and relies on high-speed rotation of roller brushes to complete cleaning, which is suitable for cleaning most pollutants.
Remote control crawler photovoltaic cleaning robot can work alone or collaboratively over a 4G network. Managers can remotely command and control multiple robots through the software, and the robot's working conditions and fault conditions can also be transmitted back to managers through the wireless network to facilitate remote management and control.
Product parameters
Product Model | ZTG-3310 |
Product Name | Remote control crawler photovoltaic cleaning robot |
Standard Width | 400 mm |
Standard Height | 215 mm |
Length | customizable |
Weight | / |
Power Mode | Lithium batteries,rechargeable photovoltaic panels |
Rechargeable photovoltaic panel power | 50W/24V |
Battery Power | 24V/10A |
Time Required to Fill the Battery | 4-5 hours |
Design Lifetime | 3-5 years |
Motor Power | 90 W |
Brush Hardness | SHORE-A30 |
Controller | Industrial PC (self-developed) |
Network Access | 4G |
Design Lifetime | 6 years |
Dry-brush Working Mode | |
Cleaning Speed | 14m/min |
Maximum one-way Distance | 600 m |
Working Temperature | -20 ~ 80℃ |
Boot Mode | Automatically start on time |
Ccontrol Mode | Automatic, manual, remote control |
Control Platform | Remote service platform + mobile APP |
Night Work | Support |
Product Details
Product Advantage
Product Maintenance
To ensure the normal operation of the machine and extend the service life of the machine, the following parts must be lubricated and maintained:
1. The chain of the transmission mechanism needs to be checked every month, and calcium matrix grease is added every three months.
2. The reducer every two years to check and replace the calcium matrix grease.
3. To ensure the safe operation of the equipment, it is necessary to regularly check whether the bolts everywhere in the equipment are loose, and whether there is abnormal sound, and then the machine can be run.