Shaanxi Zhongtuo Mine Equipment Co.,Ltd 86--13571973823 summer@ztmineequipment.com
High Efficiency Upsetting Cold Forging Machine

High Efficiency Upsetting Cold Forging Machine

  • Highlight

    Upsetting Cold Forging Machine

    ,

    Rebar Forging Machine

    ,

    Cold Forging Rebar Processing Machine

  • Weight
    560kg
  • Size
    1020*500*965mm
  • Voltage
    380V
  • Nominal Displacement
    10ml
  • Power
    7.5kw
  • Greater Flow
    Rebar
  • Brand
    Zhong Tuo
  • Speed
    1440r/min
  • Place of Origin
    Shaanxi
  • Brand Name
    ZHONGTUO
  • Certification
    CE; ISO
  • Minimum Order Quantity
    1PC
  • Price
    negotiated
  • Packaging Details
    Wooden Case
  • Delivery Time
    7-15Days

High Efficiency Upsetting Cold Forging Machine

Description of Upsetting Cold Forging Machine:
The steel bar upsetting machine uses the principle of hydraulic cold heading to plastically deform the end of the steel bar, increasing the diameter by 4~6mm, and then processing the thread. The actual cross-sectional area after processing the line is larger than the original steel bar cross-sectional area, and the tensile strength of the joint is improved.

Product Usage:
It is used to upsetting the head of the steel bar. After the upsetting, the strength of the steel bar base material is improved, the tensile strength is already reached, and the thread rolling and connection are performed. Improve the safety of the project.
The equipment operation is simple and easy, and one person can operate it. After the steel bars are placed, the foot switch under the tower will automatically run the equipment, which saves labor and reduces workers' fatigue and can be processed continuously.

 

Technical Parameter of Upsetting Cold Forging Machine

Motor Oil Pump
Power 7.5kw Nominal displacement 10ml
Voltage 380v Rated voltage 31.5mpa
Speed 1440r/min Rated speed 1500r/min

 

High Efficiency Upsetting Cold Forging Machine 0

High Efficiency Upsetting Cold Forging Machine 1

Safety operation rules for steel bar upsetting machine
1. The staff must undergo technical training and pass the skill assessment before they can work on the job
2. Before formal processing, the equipment should be debugged and run for 2-3 minutes, and the processing operation can only be performed after it is normal.
3. The incision of the steel bar blanking is straight without bending.
4. Before processing steel bars, the machine should return to the initial position before processing to ensure consistent processing.
5. There should be no transverse cracks in the processed steel bars, and equipment failures should be eliminated in time.
6. When refueling, No. 46 hydraulic oil should be added.
7. The staff should abide by the safety protection regulations for engineering personnel.