Description of Water Well Drill Machine
Compared with other similar products, it has the advantages of light weight, simple structure, fast drilling speed and large diameter of core samples.
Application of Water Well Drill Machine
It is suitable for engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings; geological core drilling and physical survey; drilling of small grouting holes and blasting holes; drilling of small water wells. Divided into: telescopic/foldable two-phase electric, three-phase electric, gasoline engine, diesel engine
Parameters of Water Well Drill Machine
Rig model | ZSJD-100 type | Motor Power | 4000W |
Drill pipe diameter | 42mm | Drilling and crushing method | Impact Rotary |
Dimensions | 80cm*80cm*245cm | Drilling depth | 100-200M |
Drill pipe length | 1.5m | Pump power | 2.2KW |
Rig weight | 200KG | Drilling diameter | Within 400mm |
Drill pipe replacement method | Thread button (automatic double thread) | Machine Height | 2 meters |
Applicable voltage | 220V/380V | Force | 1000KG |
Rig model | ZTJD-150 type | Motor Power | 4000W |
Drill pipe diameter | 50mm | Drilling and crushing method | Impact Rotary |
Dimensions | 90cm*90cm*245cm | Drilling depth | 100-200M |
Drill pipe length | 1.5m | Pump power | 2.2KW |
Rig weight | 250KG | Drilling diameter | Within 400mm |
Drill pipe replacement method | Thread button (automatic double thread) | Machine Height | 2 meters |
Applicable voltage | 220V/380V/ Gasoline / Diesel |
Force | 2000KG |
Rig model | ZTJD-180 type | Motor Power | 4000W |
Drill pipe diameter | 50mm | Drilling and crushing method | Impact Rotary |
Dimensions | 100cm*100cm*245cm | Drilling depth | 100-200M |
Drill pipe length | 1.5m | Pump power | 2.2KW |
Rig weight | 290KG | Drilling diameter | Within 500mm |
Drill pipe replacement method | Thread button (automatic double thread) | Machine Height | 2 meters |
Applicable voltage | 220V/380V/ Gasoline / Diesel |
Force | 2000KG |
Daily maintenance of Water Well Drill Machine
1. The motor part of the drilling rig should be handled with care to avoid rain, splashing water,
2. The motor wire connector should not be touched and connected to the electricity.
3. Always check whether the wire rope is replaced.
4. Before and after use, the drill rod screw head should be lubricated with oil and placed in a rain shelter to avoid rusting.
5. The motor cannot be overloaded for a long time.
6. Check the circuit and transformer insurance when the motor does not rotate.